论文部分内容阅读
苏里格气田位于我国内蒙古鄂尔多斯市境内的苏里格庙地区,面对日益紧迫的资源开发任务,冬季施工必将成为整个苏里格气田地面工程建设的重要组成部分,其特点是冬季气候恶劣、施工条件差、施工效率低,给气田地面工程冬季施工带来极大的困难。为了确保冬季施工能顺利进行,从冬季施工的前期准备到后期施工管理所采取的一系列具体措施是本文的核心内容。
Sulige Gas Field is located in the Suligemiao area in the Ordos city of Inner Mongolia. In the face of an increasingly urgent resource development task, the winter construction will surely become an important part of the groundwork construction of the entire Sulige Gas Field. It is characterized by poor winter weather , Poor construction conditions and low construction efficiency, which bring great difficulties to the winter construction of gas field ground engineering. In order to ensure the successful construction in winter, a series of concrete measures taken from the preliminary preparation in winter construction to the later construction management are the core contents of this article.