论文部分内容阅读
本文探讨了冲压车间设计中存在的几个问题,从而有针对性提出:产品设计必须符合与生产规模相适应的工艺水平的要求;生产规模的划分决定于零件加工方案的成本;半成品库的贮存期是由零件投入的批次决定的;在中小批生产中,减少换模时间,是提高大型冲压设备利用率、减少设备投资的主要途径之一;冲压车间厂房不应死抠苏联标准,应根据具体条件而定。
This article discusses several problems in the design of stamping workshops, which are targeted: product design must meet the requirements of the process level that is compatible with the production scale; the division of production scale is determined by the cost of the parts processing plan; the storage of the semi-finished products database The period is determined by the batch of parts to be put into production; in small and medium batch production, reducing the time for changing molds is one of the main ways to increase the utilization rate of large-scale stamping equipment and reduce equipment investment; the stamping plant workshops should not die of Soviet standards, should According to the specific conditions.