论文部分内容阅读
我段管内××线6+960一孔1.75米钢筋混凝土圆涵,全长58.75米(共58节圆管),涵顶填土高16.5米。涵管入口处地面经多年沉积已增加不少,1~33节间的涵管因地基松软,渗水漏水严重,管节大量下沉,第33节(从入口算起)涵管已经破损。此涵曾鉴定为报废涵洞,设计部门还提出在附近新建泄水洞的方案。我段广大职工在党的领导下,发扬艰苦奋斗、勤俭建国的革命精神,经过认真研究,采取提高1~33节涵管的办法,整治了病
I paragraph tube × × line 6 +960 a hole 1.75 m reinforced concrete round culvert, a total length of 58.75 meters (a total of 58 sections of pipe), culvert fill 16.5 meters high. Culvert entrance has been increased by many years of sedimentation on the ground a lot, 1 to 33 internation of the culvert due to soft ground, seepage water leakage, a large number of pipe sinking, section 33 (from the entrance count) culvert has been damaged. This Han has been identified as scrap culverts, the design department also proposed a new project near the drain hole. Under the leadership of the party, a large number of our workers and staff members carry forward the revolutionary spirit of hard work and thrift and building the country through careful study and improvement of the culverts of 1 to 33 sections