论文部分内容阅读
耿村煤矿位于河南省西部渑池县境内,是义马煤业集团公司的骨干矿井之一。1975年建井,1982年底建成投产,原设计能力120万吨,1992年改扩建后,设计能力达到240万吨,现有职工4500人。生产的煤种为低硫、低灰、高挥发份、长焰动力煤。矿井采煤机械化程度达到100%,综掘机械化程度达到51.3%。 以科技为先导,不断追求高产高效是耿村煤矿发展的一大动力。近年来,在社会主义市场经济条件下,该矿发扬“顽强拼搏,争创一流”的企业精神,大力开展“转机制,抓管理,练内功,增效益”活动,从优化生产组织机构,合理配置生产要素入手,通过采区合并,实现了合理集中
Located in the county of Dianchi County in the west of Henan Province, Yancun Coal Mine is one of the backbone mines of Yima Coal Group Corporation. The well was built in 1975. It was completed and put into operation at the end of 1982. The original design capacity was 1.2 million tons. After the reconstruction and expansion in 1992, the design capacity reached 2.4 million tons and there were 4,500 employees. The coal produced is low-sulfur, low-ash, high-volatile, long-flame thermal coal. The degree of mechanization of coal mining reached 100%, and the mechanized degree of comprehensive mining reached 51.3%. Taking science and technology as the guide and constantly pursuing high output and high efficiency is a major driving force for the development of Yucun Coal Mine. In recent years, under the conditions of the socialist market economy, the mine has promoted the entrepreneurial spirit of “struggling and striving for excellence” and vigorously carried out activities of “transforming mechanisms, grasping management, practicing internal strength, and increasing profits”, and optimized the organization of production and reasonable The allocation of production factors to start, through the merger of mining areas, to achieve a reasonable concentration