提起古比雪夫水电站的建设,就联系到许多建筑安装的巨大工程数量:土方工程15,200万立方公尺,混凝土和钢筋混凝土工程约800万立方公尺,滤水层和排水设备520万立方公尺,钢钣椿4.43万吨,金属结构和机械安装9.78万吨,以及其他的许多工程量。古比雪夫水利枢纽的建筑物中,很大一部份是大体积的加筋混凝土结构,而个别的才是钢筋混凝土结构。兹列举若干最大型水工建筑物的工程数量于下表中,以资对比。
In connection with the construction of the Gubishev hydroelectric power station, a large number of projects involving construction and installation were involved: 152 million cubic meters of earthworks, about 8 million cubic meters of concrete and reinforced concrete works, 5.2 million cubic meters of drainage and drainage facilities 44,300 tons of steel sheet metal, 97,800 tons of metal structures and machinery, and many others. A large part of the buildings in the Gubischeff Water Conservancy are large-volume reinforced concrete structures, some of which are reinforced concrete structures. The number of projects that list some of the largest hydraulic structures in the table below is for comparison.