论文部分内容阅读
葛洲坝工程设计图的种类有多种,有设计草图、正式描绘的底图;有着色的彩色图、透视图;有立体感很强的鸟瞰图。葛洲坝工程是大型水利枢纽工程,它的兴建,就是依据这一张张设计图建设起来的,仅一期工程施工设计阶段的设计图即达万余张。葛洲坝工程设计图的运转过程,原先是将草图送交绘图室描绘成底图,然后,经过总工程师核准后签字发往施工单位。后来我们进行
There are many kinds of design drawings of Gezhouba Project, there are design sketches and the formal drawings of the base map; colored colored diagrams and perspectives; and the aerial view with the strong three-dimensional effect. Gezhouba dam project is a large-scale water control project, and its construction, is based on this piece of design drawings built up, only a construction design phase of the project that is up to more than ten thousand sheets. Gezhouba engineering drawings of the operation of the process, the original draft is sent to the drawing room described as the bottom map, and then, after the approval of the chief engineer signed and sent to the construction unit. Then we proceed