列宁格勒水工设计院与特种结构设计局列宁格勒水工钢结构设计院协作,进行过一系列位于高坝下游面的钢—钢筋混凝土混合结构的输水管道设计。这种管道已在克拉斯诺雅尔斯克和契尔克依斯克水电站运用。萨扬—舒申斯克水电站也作了这种管道的设计。管道布置在坝的计算剖面外。与坝内式管道相比,其优点是:不会削减下游最大应力部位的坝体,并可按机组投入运行的顺序进行施工,即可与坝体分开施工。这就使得投资不致积压,且能减轻安装工作的强度。 In collaboration with Leningrad Hydro-Steel Design Institute, Leningrad Hydro-Design Institute conducted a series of design of pipelines for steel-reinforced concrete hybrid structures located on the downstream side of high dam. The pipeline has been used in Krasnoyarsk and the Kırıkshke hydroelectric power station. Sayan - Shushenskaya hydropower station also made such a pipeline design. The pipe is arranged outside the dam’s calculated section. Compared with the dam-type pipeline, the advantages are: do not reduce the dam downstream of the maximum stress parts, and can be put into operation in accordance with the order of construction units, you can separate construction with the dam. This keeps investment backlog and reduces the intensity of installation.
其他文献
北截金矿是招掖成矿带重要的矿床之一 ,主要受北东向的灵山沟—北截断裂控制。其成矿演化过程大致可分为四个阶段 ,矿化以Ⅱ、Ⅲ阶段为主。不同阶段具有不同的围岩蚀变类型 ,
一般设计水工建筑钢筋混凝土时,只根据强度设计,往往没有考虑这种建筑物的特性;对于混凝土的不透水性及耐冻性要求,没有应有的认识,而仅限于计算混凝土的强度标号,然后再按
上犹水电站修建在江西南部赣江支流——上犹江的跌扇关,該处河谷狭窄,两岸山坡陡峻,筑坝地段河宽仅約50公尺,电站即修建在攔河的重力坝內,为一坝內式水电站,电站的几个主要
简要介绍了由美国一些科学家最近提出的 ,引起国际地球科学、环境科学、生命科学及宇宙科学界广泛关注的新元古代雪球假说 (theSnowballEarthHypothesis) ,及其近期研究情况
引言 1999年9月21日当地时间凌晨1时47分(世界协调时为1999年9月20日17时47分)在台北以南约150km的台湾中部南投县集集镇附近发生了一次矩震级M_w=7.6的大地震。截至1999年1
一、序  言 党提出教育结合生产劳动的方针後,水利系毕业同学进行了真刀真枪的毕业设计。昌平设计级德胜口小组负责德胜口沟的流域开发设计任务。从生产上看,在石门坝址做
隐喻的传统修辞学研究、纯语义研究、语用研究、认知研究对隐喻的研究做出了贡献,但在隐喻的诗学功能、隐喻的辨认、隐喻意义获取的阐明问题上存在不足,而从语用认知视角对隐
第二部分在本文第一部分中已闡明了防止岩石基础上大埧混凝土溫度裂縫的現有的实际运用方法。曾指出,这些措施可能是較簡單的,而且在很多种情况下,还可以节約水泥和资金,但
一、黄河现状极不稳定黄河为害的原因除了它的洪水外还有它的泥沙。它历求以善淤善决著名,在郑州以下的大平原里黄河改道的次数很多,它的出海口极北曾达天津极南曾达阜宁。
我省位于黄河中游,全部面积156,400平方公里,其中石山区与黄土丘陵地区占总面积的70%以上。高山陡峭,坡度很大,同时由于地形狭窄,许多河流都是长度短而坡度大;再加雨量分布不