论文部分内容阅读
简要介绍武广铁路客运专线综合试验段无砟轨道系统施工工艺及流程,同时介绍了根据现场实测资料统计分析后所确定的单价分析,供今后高等级铁路设计编制概算时参考。
This paper briefly introduces the construction process and process of the ballastless track system in the comprehensive test section of the Wuhan-Guangzhou Passenger Dedicated Railway, and introduces the unit price analysis determined after the statistical analysis of the measured data in the field for future reference in the preparation of high-grade railway design estimates.