论文部分内容阅读
贵刊1986年第6期刊登的《以灌溉为主结合发电的中小型水库兴利的简捷算法》一文中介绍的设计年来水量模数、灌溉面积模数和年调节库容模数的计算方法,简捷明了,接近实际,特别适用于已建的中小型水库改建为灌溉、发电相结合的工程的水能设计和效益核算。但该文中所介绍的电站动能指标的拟定方法尚有待商榷。现提浅见供讨论。
The calculation method of annual runoff modulus, irrigated area modulus and annual adjusted reservoir capacity modulus introduced in the article entitled “A Simple and Convenient Algorithm for Developing Small and Medium-sized Reservoirs with Irrigation-Based Power Generation” published in No. 6, 1986, Simple and straightforward, close to the reality, especially for the reconstruction of small and medium-sized reservoirs has been built for irrigation, power generation project combining water energy design and benefit calculation. However, the method of formulating the kinetic energy index of power station introduced in this paper is yet to be discussed. Are shallow for discussion.