论文部分内容阅读
位于土耳其首都安卡拉东南约600km,接近土耳其—叙利亚边界的阿纳多卢高地,目前将集中250台卡特彼勒大型土方机械,建筑幼发拉底河上第三座也是最大的一座大坝——阿塔丢尔克大坝。这个大坝将成为世界第四大填石坝。大坝建成后将缓和土耳其紧缺的电能需求,从而减少石油进口。电站将安装8台发电机纽,总容量为2400MW,年发电量80亿度。施工期约10年,耗资将达40亿美元。坝体长1664m,高184m,需要土石方约为8500×10~4m~3。这些工作要在74个月内完成,
Located in the Anadolu Heights, about 600km southeast of the Turkish capital Ankara, near the Turkish-Syrian border, 250 large Caterpillar earthmoving machines are now being built to build the third and largest dam on the Euphrates - G dam This dam will be the fourth largest dam in the world. The completion of the dam will ease Turkey’s shortage of electricity demand, thereby reducing oil imports. The plant will install eight generators New Zealand, a total capacity of 2400MW, the annual generating capacity of 8000000000 degrees. Construction period of about 10 years, costing up to 4 billion US dollars. The dam body is 1664m long and 184m high, requiring about 8500 × 10 ~ 4m ~ 3 earthwork. These tasks should be completed within 74 months,