醍醐物流基地二期建设工程方案研究

来源 :建材与装饰 | 被引量 : 0次 | 上传用户:renj19861123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文基于陕西醍醐物流基地二期建设工程,根据场地既有现状及征求了铁路局的意见共研究了两个建设方案,经对比分析后推荐方案Ⅰ为建设方案。醍醐物流基地二期的建设将有效利用既有铁路闲置土地,盘活铁路资产,避免铁路土地流失风险,又可以进一步完善基地功能,提升创效能力。同时又能带动物流基地周边及澄城县的经济发展。 Based on the construction project of Phase II of Shaoguan Shaoguan Logistics Base, this paper studies two construction schemes based on the current status quo of the site and soliciting the opinions of Railway Administration. After comparing and analyzing, I recommend scheme Ⅰ as the construction scheme.醍 醐 The construction of the second phase of logistics base will effectively utilize the idle land of existing railways, activate the railway assets, avoid the risk of railroad land loss, and further improve the functions of bases and enhance the capability of establishing innovative bases. At the same time, it can also promote the economic development around the logistics base and Chengcheng County.
其他文献
期刊
期刊
利用面向对象的分析方法对复杂形状刀具CAD/CAM系统进行了研究,导出了该CNC系统的信息模型.并详细介绍了该信息模型的组成和原理.
进入21世纪以来,我国机床市场极为火爆,自2002年起,我国已连续3年保持了世界第一机床消费大国的地位.这期间我国机床进口金额也快速增长,2004年,我国机床工具产品进口金额迅
龙华乡围绕宜居、宜业、宜游的目标,把农村人居环境整治作为美丽乡村建设的首要任务,以生态宜居为关键,大力推进村庄环境整治.坚持农村生活垃圾治理常抓不懈,开展垃圾集中清
期刊
公路桥作为中国建设高速公路的重要措施,其安全关系着全国人民的生命安全。随着我国经济的飞速发展,公路桥的建设已经遍地开花,但是在已建成的桥梁身上发现了许多问题,在建的
期刊
期刊
期刊