High Temperature Impact on Performance of LMFBR Structure Materials

来源 :Annual Report of China Institute of Atomic Energy | 被引量 : 0次 | 上传用户:blaze1982
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Commercial liquid metal fast reactor(LMFBR)was designed to last for 35 to 40 years,the understanding of the mechanical behavior of the structure materials used is required for(2.2-2.5)×10~5h type 304 and 316 stainless steel are used extensively in LMFBRs.These alloys are in a metastable state when installed and evolve to a more stable state,and therefore,microstructure Commercial liquid metal fast reactor (LMFBR) was designed to last for 35 to 40 years, the understanding of the mechanical behavior of the structure materials used is required for (2.2-2.5) × 10 ~ 5h type 304 and 316 stainless steel are used extensively in LMFBRs.These alloys are in a metastable state when installed and evolve to a more stable state, and therefore, microstructure
其他文献
We had mainly carried on the debugging and commissioning of CYCIAE-100 for HI-13 Tandem Accelerator Upgrade Project in 2016.The installation and commissioning o
1 Information of operation and production Operation person:Present chief operators are 6 persons,operators are 3 persons;new chief operators is 0person,new oper
2015年4月29日,太行国宾馆柏坡厅,省政协十一届十二次常委会议在这里举行。依照惯例,每位常委及列席人员的会议材料当中,都会有两本省政协办公厅印发的大会发言合订本,一本是
The generation Ⅲ nuclear power plant designs incorporate latest research results in the field of nuclear safety and a wealth of operational experience in nucle
The terminal voltage of 5SDH-2 pelletron accelerator is from 150 kV to 1.7 MV,so the energy of single charge particle accelerated is from 300 keV to 3.4 MeV.The
According to the service condition of nuclear power plant,optimizing the water chemical parameters is one of the most economical and effective methods to improv
~(135)Cs with a half life of T1/2=2.3×106 a is an interesting nuclide in studies of the dispersal of nuclear material in the environment.Preliminary measuremen
On December 23,the zero-power reactor assembly“Venus Ⅱ’’realized the first critical operation^marking a new milestone in China~’s accelerator-driven subcri
3月30日下午,李克强总理在人民大会堂会见了美国总统特别代表、财政部部长雅各布·卢。在近一小时的会谈中,李克强总理回应了雅各布·卢的一系列尖锐提问,并主动向美方“提要
In order to expend the upper limit of beam LET,the technology of ~(238)U target cone preparation,ion source extracting and high charge state~(238)U ion extracti