论文部分内容阅读
2007年3月31日,中水珠江设计公司由黄刚强副总经理领队,总经理助理李星召及红河南沙、马堵山水电站正副设总一行5人参加了在红河南沙水电站工地现场召开的红河南沙、马堵山水电站计划工作会议。参加会议的单位有:红河州人民政府、红河州发改委、红河州移民局、红河广源水电开发有限公司、中水珠江规划勘測设计有限公司、广东科源监理咨询公司、广东水电二局股份公司、移民监理。
On March 31, 2007, Zhongshui Pearl River Design Company was led by Huang Gangqiang, deputy general manager and assistant to General Manager Li Xingzhao, along with Nansha, Honghe Navy and Ma Dianshan Hydropower Station. Five people attended the site of Red River Nansha Hydropower Station, , Horse blocking power station planning work conference. The units participating in the meeting are Honghe Prefecture People’s Government, Honghe Prefecture Development and Reform Commission, Honghe Prefecture Immigration and Civilization Bureau, Honghe Guangyuan Hydropower Development Co., Ltd., Zhongzhu Zhujiang Planning and Design Co., Ltd., Guangdong Keyuan Supervision Consulting Co., Ltd., Immigration supervision.