论文部分内容阅读
针对古田溪三级电站大坝坝基运行中出现的一些异常现象,对该坝的坝基地质、扬压力观测资料以及水质情况进行了分析研究,摸清异常的原因,并介绍了补强加固措施和工程效果。
Aiming at some anomalies in the operation of dam foundation of Gutian River III hydropower station, this paper analyzes and studies the dam foundation geology, uplift pressure observation data and water quality to find out the cause of the anomaly and introduces the reinforcement measures and Engineering effect.