论文部分内容阅读
在大理供电局营销部见到杨洪涛时,他正在飞速敲打着键盘,电脑旁是昨夜加班整理出的一摞资料。每逢开会前夕,他都要加一宿的班,把会上需要通报的数据认真统计、核对一遍,再把近期收集的问题进行归类,制定下一阶段的工作方案。大理供电局的营配信息集成建设工作协调会已经召开了18次。而明天恰是第19次会议召开的时间,正是一个月里杨洪涛最为忙碌的几天。通过营配信息集成,大理局深化了快速复电应用,抢修复电时间可平均缩短10到20分钟;
When Yang Hongtao was met by the marketing department of Dali Power Supply Bureau, he was beating the keyboard at a rapid pace. Next to the computer was a pile of data that had been worked overtime last night. On the eve of the meeting, he will have to take a night’s class to carefully count and check the data to be circulated at the meeting and classify the problems collected in the near future to formulate the work plan for the next phase. Dali Power Supply Bureau of the camp information integration construction coordination meeting has been held 18 times. Tomorrow is precisely the 19th meeting of the time, it is the most busy days of Yang Hongtao a month. Through the integration of the distribution information, the DDA deepened the application of fast power-on and shortened the repair and restoration time by an average of 10 to 20 minutes.