六郎洞电厂位于云南省喀斯特地区,该电厂是以典型的喀斯特溶洞地下水为水源的发电厂。地下水属碳酸盐硬水,年平均含砂量为0.174kg/m~3,最大月平均含砂量为0.878kg/m~3,水中含游离CO_2气体38.7~43.03mg/l。该电站装有两台出力为12500kW的HL160—LJ—140型水轮机。从1960年投入运行以来,水轮机遭到了严重地损坏,成为全国闻名的水轮机快速损坏的电站。至1978年止,先后不得不
The Kalangdong Power Plant is located in the karst area of Yunnan Province, a power plant that uses typical karst cave water as its source. Groundwater is carbonate hard water, with an average annual sand content of 0.174kg / m ~ 3, the maximum monthly average sand content of 0.878kg / m ~ 3, water containing free CO_2 gas 38.7 ~ 43.03mg / l. The plant is equipped with two HL160-LJ-140 turbines with a capacity of 12,500 kW. Turbines have been severely damaged since they were put into operation in 1960 and have become well-known power plants in the country that are rapidly damaged by turbines. Until 1978, has had