由我院设计的黄河刘、盐、八、青梯级水电站以及长江水系的(白龙江)碧口(汉江)石泉、石门等大中型水电站在60~70年代先后投入运行,为西北地区提供了充足的能源,促进了国民经济的发展.由于目前技术的进步,特别是龙羊峡多年调节水库的投入,可使下游刘、盐、八、青等梯级电站保证出力提高25.48万千瓦,增加年发电量5.13亿度,因此,对西北地区大中型水电站的技术改造工作是势在必行了.下面谈几点个人意见,限于专业与水平,挂一漏万在所难免,敬请批评指正.
The large and medium-sized hydropower stations of the Yellow River Liu, Yan, Ba, Qingcao Hydropower Station and the Bikou (Bailongjiang) Bikou (Hanjiang) Shiquan and Shihmen designed by our institute were successively put into operation from the 1960s to the 1970s and provided ample Energy, and promote the development of the national economy due to the current technological advances, especially the Longyang Gorge reservoir for many years to adjust the investment can make the downstream Liu, salt, eight, green and other cascade hydropower stations to ensure that power output increased 258,400 kilowatts, an increase of annual power generation 513 million degrees, therefore, the technical transformation of large and medium hydropower stations in Northwest China is imperative .Then talk a few personal opinions, limited to the professional and the level of hanging a mistake is inevitable, please criticism and correction.