论佛山水道污染问题的初步改善

来源 :人民珠江 | 被引量 : 0次 | 上传用户:bolinyuan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1958年佛山水道兴建了沙口分洪堰及船闸。由于只考虑解决洪涝、照颐交通,未从长远考虑,统一规划、综合治理,因而当工程完工后,出现了一些问题。如:(1)加重河水污染,成为佛山市和水道两岸的公害;(2)船闸过小,不能适应航运事业发展的需要;(3)水道两岸堤围防洪能力有所下降等。 1958 Foshan waterway construction of sand port flood weir and ship lock. Since only consideration is given to solving the problem of floods and traffic accidents, it is not considered in the long term, unified planning and comprehensive management. Therefore, some problems have arisen after the completion of the project. Such as: (1) aggravating river pollution and becoming a public hazard in both sides of Foshan and watercourses; (2) shiplocks being too small to meet the needs of the development of the shipping industry; and (3) the flood control capacity of dike embankments in the waterways has declined.
其他文献
本文构造了催化介质中的Ornstein-Uhlenbeck过程,并在有限测度情形,证明了其persistence性质(d=1). In this paper, the Ornstein-Uhlenbeck process in catalytic media is constructed, and its persistence pro
统筹法(国外称计划协调技术)是一种科学的计划管理方法,早在五十年代已在国外应用,我国也在1965年开始试行,目前已在工交建筑企业广泛推广应用.实践证明,它是合理进行施工组
本文推导了计算装机容量为5~1000兆瓦、水头为5~300米的发电站费用的公式。在以前的文章中,作者曾论证利用数学公式估算5兆瓦以下小容量水电站的费用是可行的。1000兆瓦以下较
辽河是我国七大江河之一,地理位置在东经117°00′~125°30′、北纬40°30′~45°10′之间,发源于河北省七老图山脉之光头岭,流经河北、内蒙古、吉林、辽宁四省区,流域总面积2
井下工具质量的好坏直接影响原油的生产.中原油田技术监测中心产品质量监测总站对油田井下工具抽检了200台,质量合格的72台,不合格的128台,合格率仅为36%.在抽检的200台井下
本书系第3版,叙述了近10年来在遥感领域所取得的重大进展。遥感可应用于石油勘探、植被填图、环境和自然灾害记录和预报。本书包括了若干种学科,增加了5%以上的新内容。全书
戏曲种类的清理和划分是戏曲学科建设的基础工程,种类概念的含混对打造戏曲理论体系的工作妨碍很大。但戏曲的形态构成和流变方式十分复杂,以致对戏曲种类的清理至今仍然是戏
用分解极化曲线法研究了在 0 .1 mol/ L Cr2 ( SO4) 3+1 mol/ L Na2 SO4+0 .2 mol/ L H2 SO4溶液中 Pt和Pb O2 电极上 Cr2 O2 - 7阳极形成和 O2 析出过程中温度的影响 .实验
A reversed-phase high-performance liquid chromatographic method for the separation and quantitation of 1.4-phenylenediamine, 4-aminophenol, 3-aminophenol. 1,3-b
本文利用反相高效液相色谱外标法测定了豆草隆的含量 ,标准偏差为 0 .12 ,变异系数为 0 .59% ,平均回收率 99.9% In this paper, RP-HPLC method was used to determine the