论文部分内容阅读
本文介绍了七万吨级卸煤专用码头工程胸墙模板的设计和施工技术,对码头胸墙和墩式码头胸墙施工有参考价值。
This article introduces the design and construction technology of chest wall formwork for 70,000-ton unloading special dock project, which has reference value to the chest wall construction of dock pier and piers dock.