蚌埠闸水电站是蚌埠闸水利枢纽工程的一部分,装机容量为6×800kW。电站自1986年元月投产以来,累计发电3.4亿kW·h,为蚌埠闸枢纽工程综合效益的充分发挥起到了积极作用,创造了很好的经济效益,也曾为缓解蚌埠市电力紧张状况,促进蚌埠地区经济发展起到推动作用。随着机组运行时间的增长,设备的磨损及老化现象日趋严重,进行必要的技术改造对增加经济效益和提高设备运行的安全可靠性具有积极的作用,如推力轴承的油冷却器的改造就是成功的一例。
Bengbu Hydropower Station is part of Bengbu Gate Water Control Project with an installed capacity of 6 × 800kW. Since it was put into operation in January 1986, the power plant has accumulated a total generating capacity of 340 million kW · h, which has played a positive role in giving full play to the comprehensive benefits of Bengbu Gate Project and has created very good economic benefits. In addition, it has also eased the power shortage in Bengbu City, Promote the economic development in Bengbu play a catalytic role. With the increase of unit operating time, the wear and aging of equipment are becoming more and more serious. Performing the necessary technological transformation has a positive effect on increasing economic benefits and improving the safety and reliability of equipment operation. For example, the reform of the oil cooler of thrust bearing is successful An example.