北京地铁复八线,西起复兴门站,东至四惠东站(原八王坟东站),全长13.59公里,共设12座车站。复兴门站至西单站1.81公里,已先于1992年建成。西单站以东至线路东端共设11座车站,其中9座地下站和两座地面站在八王坟设地面车辆段一处,车辆段顶部为30万平方米的大平台,准备在其上建设约60万平方米的建筑地铁复八线全部工程于1999年9月28日建成。
Beijing Subway Fuzhao Line, west of Fuxingmen Station, east of four Huidong Station (formerly the Eight King Fen East Station), a total length of 13.59 km, a total of 12 stations. Fuxingmen Station to Xidan Station 1.81 km, has been completed in 1992. From the east of Xidan Station to the east of the line, a total of 11 stations, of which 9 underground stations and two ground stations are located at the ground car depot of Bawangfen and the top of the depot is a large platform of 300,000 square meters are ready for installation Construction of about 600,000 square meters of building Metro eight lines all the works completed on September 28, 1999.