论文部分内容阅读
隔河岩水利枢纽位于清江干流,上距恩施208公里,下距宜都62公里,距搬鱼咀水文站23公里.集水面积14,430平方公里,为清江流域面积的85%。长阳于1950年11月曾设立水文站观测清江干流水位、流量.1953年曾迁至下游搬鱼咀,1975年又迁回原处,继续观测.1967年我办原水文处开展隔河岩枢纽初步设计,关于洪水计算是依据搬鱼咀及长阳两站的水
Geheyan Water Control Project is located in the main stream of Qingjiang River, 208 kilometers away from Enshi, 62 kilometers away from Yidu, and 23 kilometers away from Yingyuzui Hydrometric Station, covering an area of 14,430 square kilometers, accounting for 85% of the area of the Qingjiang River. Changyang Hydrological Station was established in November 1950 to observe the main stream of the Qingjiang River water level and flow .1953 moved to the downstream move fish Tsui, 1975 and moved back to the original place, continue to observe .1967 I do the original Hydrographic Office Geheyanhe hub Preliminary design, flood calculation is based on the two stations move fish Tsui and Changyang water