金沙江通过40多年来艰苦的勘测规划设计工作,尤其是下游的溪落渡和向家坝两个姊妹电站的可行性研究报告将于1994、1995年提出,开发金沙江中、下游水电已提到议事日程。根据目前工作深度,它们的技术经济指标是优越的,建高坝的技术条件也是好的,可作为金沙江西电东送的第一批主力电站。该两电站初期装机容量分别为l200万kW和500万kW,最终
Jinsha River through 40 years of hard survey planning and design work, especially the downstream Creek Falls and Xiangjiaba two sister power plant feasibility study report will be proposed in 1994 and 1995, the development of the Jinsha River, downstream hydropower has been mentioned To the agenda. According to the current depth of work, their technical and economic indicators are superior, and the technical conditions for constructing high dam are also good, and can be used as the first batch of main power stations sent from the west to the east of the Jinsha River. The initial installed capacity of the two power plants were 12 million kW and 5 million kW, respectively