论文部分内容阅读
1991年4月25日,在美国加利福尼亚州洛克威尔公司的工厂里举行了奋进号航天飞机的竣工典礼和交付仪式。数千人参加了这次节日般的典礼。崭新的奋进号航天飞机在欢呼与挥动旗帜的人群面前滑出了生产线。 4月30日,奋进号航天飞机在该工厂装上了NASA的新型波音747航天飞机运载机,并在次日飞抵德克萨斯州的约翰逊空间中心附近的埃灵顿机场。5月3日,奋进号航天飞机又被送到佛罗里达州的肯尼迪空间中心,其反作用控制系统舱、轨道机动飞行系统舱及主发动机将在这里装配。奋进号航天飞机的设计与以前制造的航
On April 25, 1991, the completion and delivery ceremony of the space shuttle Endeavor was held in the factory of Rockwell, California, USA. Thousands attended the festival-like ceremony. The new Space Shuttle Endeavor slides out of the production line in front of people who cheer and wave their banner. On April 30, space shuttle Endeavor installed NASA’s new Boeing 747 shuttle at the plant and flew to Ellington Airport, near Johnson Space Center in Texas, the following day. On May 3, the Space Shuttle Endeavor was delivered to the Kennedy Space Center in Florida where its reaction control system module, orbital maneuvering flight system module and main engine will be assembled. Endeavor space shuttle design and manufacture of the previous flight