论文部分内容阅读
针对南钢新铁厂2号高炉冶炼过程中经常出现的问题,结合生产实践,对该高炉现有炉料的冶金性能进行试验检测分析,研究南钢现有炉料冶金性能的不足,并分析原因,找出可行的解决办法。同时,为南钢新铁厂2号高炉炉料结构的优化提供可靠的理论依据。
In view of the problems often appearing in No.2 blast furnace smelting process of Nan Gang Iron and Steel Co., Ltd., combined with the production practice, the metallurgical properties of the existing charge of this blast furnace are tested and analyzed. The insufficiency of existing metallurgical properties of burden in Nanning Iron and Steel Co., Find a workable solution. At the same time, it provides a reliable theoretical basis for the optimization of the charge structure of No. 2 blast furnace in Nangang Iron and Steel Company.