Long-Term Sunspot Number Prediction based on EMD Analysis and AR Model

来源 :中国天文和天体物理学报(英文版) | 被引量 : 0次 | 上传用户:zhhc1987
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The Empirical Mode Decomposition (EMD) and Auto-Regressive model (AR) are applied to a long-term prediction of sunspot numbers. With the sample data of sunspot numbers from 1848 to 1992, the method is evaluated by examining the measured data of the solar cycle 23 with the prediction: different time scale components are obtained by the EMD method and multi-step predicted values are combined to reconstruct the sunspot number time series. The result is remarkably good in comparison to the predictions made by the solar dynamo and precursor approaches for cycle 23. Sunspot numbers of the coming solar cycle 24 are obtained with the data from 1848 to 2007, the maximum amplitude of the next solar cycle is predicted to be about 112 in 2011-2012.
其他文献
Highly accurate manufacture in machining industry can only be obtained with precise temperature control of the coolant (oil or water). Machine tool with more ac
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
Laminaria (Saccharina) is one of the economic important seaweeds. Through sequence analysis of 4 099 ESTs from Laminaria (971 were generated from our own cDNA l
Detailed formulation of the detached-eddy simulation (DES) based on shear stress transport model (SST) was deduced.Based on finite volume method,detached-eddy s
Creating realistic virtual humans has been a challenging objective in computer science research for some time. This paper describes an integrated framework for
Some necessary and sufficient conditions for convergence of Ishikawa Mann and steepest descent iterative sequence for accretive and pseudo-contractive type mapp
首先对虚拟企业中收益分配比例确定的基本原则进行了分析;在此基础上,针对一个产品研发级的虚拟企业,综合考虑其伙伴投资及所承担的风险,利用模糊综合评判法,给出一种收益分
Non-singular fictitious boundary integral equations for orthotropic elastic plane problems were deduced according to boundary conditions by the techniques of si
Some sharp sufficient conditions for generalized Lienard systems to have positive or negative semi-orbits which do not cross the vertical isocline are given. Ap
An approach of adaptive predictive control with a new structure and a fast algorithm of neural network (NN) is proposed. NN modeling and optimal predictive cont