意大利篷特旺图斯-苏萨水力发电厂绝大部分布置在地下,该文介绍隧洞的施工技术。为了适应21世纪意大利国内电力的需求,该国AEM公司于1996年开始修建150MW的邦焚托可斯-苏萨水力发电厂。设计规划给皮埃蒙特地区每年增加电量457 GWh。根据当地的环境条件,经过多次比选,获得了最佳的设计方案,电站绝大部分布置在地下,地处蒙贾尔迪诺和蒙桑西奥溢口两河谷间的山体中。该溢口只能进水,水库的水向外排入河流。河道峡口位于篷特旺图斯附近,多拉里帕里亚河上。该工程的导流渠为14 km的隧洞,
Most of the Cantembangs-Susa hydroelectric power plants in Italy are arranged underground. This article introduces the construction techniques of the tunnels. In order to meet the needs of domestic power in Italy in the 21st century, the country’s AEM company started construction of a 150MW state-owned Burgundy-Susa hydroelectric power plant in 1996. The design plan adds 457 GWh to Piedmont every year. According to the local environmental conditions, after many comparison and selection, get the best design, the vast majority of power station layout in the ground, is located in Mengjidinuo and Mengshanguo two valleys between the valley. The overflow can only enter the water, the reservoir of water discharged into the river. River Gap is located in the vicinity of Cantevotus, Dorapuri River. The diversion canal of the project is a tunnel of 14 km.