摘要:对于任何一个建筑工程而言,施工技术是否具有高水平是至关重要的,是确保工程整体质量的依据。可以说,如果建筑工程失去了施工技术的有力支撑,那么,其就只能是空谈。当前,随着我国社会经济步伐的进一步加快,建筑行业对于施工技术以及其管理提出了更高的要求。本文主要对当前建筑工程中的施工技术与其管理进行一番论述,并且还提出了如何采取有效的措施将施工技术及其管理水平进一步提高,以供相关人士参考。
关键词:建筑工程;施工技术;管理;措施
Abstract: for any construction project is concerned, the construction technology if it has a high level is very important, is to ensure that the quality of the whole project basis. Can say, if construction engineering lost of construction technology of strong support, so, it can only be talking. At present, with the fast development of economy, construction industry for construction technology and its management put forward higher request. This paper focuses on the current architecture engineering construction technology and management of a paper, and also puts forward how to take effective measures of construction technology and its management level will be further improved, and for relevant personage reference.
Keywords: building engineering; Construction technology; Management; measures
中图分类号:TU74 文献标识码:A文章编号:
0引言
最近幾年时间里,大量的建筑工程施工材料与工艺不断涌现,建筑工程无论是在设计、施工质量,还是在施工技术与管理上都有着良好的发展。对于任何一项建筑工程而言,仅仅有一个高水平的设计是不行的,还得有既科学又先进的施工技术以及其管理水平,因为只有施工质量提高了,工程的整体质量才会最优,我国的建筑行业规模才会越做越大。本文主要对当前建筑工程的施工技术以及其管理水平进行了一番论述,并在此基础上提出了有效的措施,以此提高施工技术及其管理水平
1.建筑施工过程中涉及的主要技术
一般来说,建筑工程施工过程中所涉及的主要技术通常有基础施工技术、钢结构技术、混凝土施工技术、建筑防水技术以及装修技术等。最近几年时间里,随着计算机技术与信息技术的快速发展,建筑工程在施工技术管理上也采用了信息化的管理技术。
1.1基础工程施工技术
在基础工程施工技术中,有两个内容最为关键,一个是桩基技术,当前建筑工程中使用最多的是超流态混凝土灌注桩以及人工挖空灌注桩这两种;超流态混凝土灌注桩是由我国技术人员经过不断研究开发出来的一种新的桩型。这种新桩对于施工技术有着很大的好处。。它的制作原理是:先用螺旋钻机进行钻孔,待其深度与规定要求相符时,再通过钻杆芯管利用其特殊的钻头向着孔内从上到下压力灌注超流态混凝土,等到混凝土层面深入到地下水位处,将所有的钻杆提出,在孔内放入钢筋笼来设计其高度,最后一步将混凝土桩补足。这种方法能够实现一次性的成桩目标,并且其在工作中不仅没有震动、噪音,而且也不会给大自然造成污染,同时它还能够在流沙、卵石等及其复杂的地质条件下正常顺利的成桩。超流态混凝土灌注桩的渗透性很强,对于施工过程中发生的断桩、桩间虚土等问题能够有效的进行处理,进一步的将单桩的承载能力提高了。其次,人工挖孔灌注桩技术;指的是在桩位部分通过人工挖掘的办法来完成成孔工作,然后放入钢筋笼,采取灌注混凝土完成基桩的方法。成孔机具有的优点是在实际操作过程中无任何震动与噪音。利用人工挖掘,不仅有利于清理成孔处,而且还能够提高孔的施工质量。为了能够保证人工灌注桩在施工过程中的安全性,应制定完善的防止土体坍塌的支护方法。通常使用的支护方法有:现浇混凝土护壁、钢筋网护壁及钢套管护壁。
1.2混凝土施工技术
混凝土在建筑工程施工中是最不可缺少的一项材料,它在各个建筑工程中起到了关键性的作用。通常,混凝土在使用过程中会因为潮湿、配比不具合理科学性而出现各种问题,所以,我们应重视起混凝土在施工过程中技术的科学性,这是至关重要的。混凝土施工过程中常使用的技术有混凝土预拌、传送技术、钢混劲性结构施工技术、预应力混凝土技术等。
1.3钢结构技术
钢结构是支撑建筑工程整体的关键,它能够确保工程整体具有高质量水平。当前,钢结构在建筑施工过程中的应用发展上,不仅涵盖了原有的钢结构安装、钢材焊接、高强度螺栓施工等技术,而且还包括了预应力钢结构技术,这是其中发展最快的一项技术。并且,最近几年时间里,随着我国大跨度的建筑工程逐步的兴起,建筑业对于预应力钢结构技术越来越重视。
2.建筑工程的管理要点分析
2.1建筑工程质量上的管理
要严格根据建筑工程的要求来规范施工人员的行为,不放过工程建设过程中的每一个环节部分,要严格的把握好监督关,只有这样建筑工程才会具有较高的质量。提高建筑工程质量的管理水平应从三个方面着手解决,第一,要保证建筑工程在施工过程中具有高质量水平;这就要求要建立完善的切实可行的质量保证制度,以此将质量目标全面的贯彻到实际施工中去,并且工程的任何一项程序都必须安排专业人员看守,力争建立高时效、科学的质量管理体系。要时刻提醒施工人员在实际操作过程中必须重视施工技术与质量问题,只有他们保质保量的完成工作,工程的整体质量水平才会得到保证,可以说,施工人员是建筑工程中最为关键的部分。对于施工单位而言,应积极全面的将施工人员潜在的创造力与积极性、能动性充分的挖掘出来,对他们进行良好的管理,提高他们对工作负责的意识,树立起质量第一的安全生产理念。第二,加强管理施工进展速度;对于施工进展速度的管理,首先应从工程自身具有的特征上着手,明确施工人员与施工队伍所要执行的具体工作内容,并制定健全的规章制度、有秩序、有监督管理意识的工程进展速度管理模式,力争竣工后的工程与预期的目标相一致。负责工程进展速度的监督管理人员在管理与配备上必须具有较高的技术能力水平及监督管理水平。对于工程的监督管理者来说,其除了要将自身的业务知识进一步提高之外,还要不断的学习新的相关知识,这样才能满足当前建筑工程的实际需求。另外,加强成本管理力度;要想将工程的成本管理工作做好,应从两个方面着手:首先,严格要求工程成本的管理必须根据事先制定的成本规划、核算、分析等各个环节执行管理工作;其次,工程项目的各个管理人员应根据自己的职责,在工作中时刻以安全生产为基本原则。
2.2建筑工程施工项目安全生产的管理
首先,必须建立完善安全且切实可行的施工制度以及管理机构制度,将安全责任明确,全面的提高员工对于安全重要性的认识。也就是说,在实际建设中融入安全意识,将安全工作抓好,从而使其两者之间形成促进作用。其次,施工企业应根据工程建设具有的特征,制定出既科学合理,又切实可行的安全管理规则。此外,工程的安全生产管理还需要生产部门人员的共同合作,因为这样能够营造出良好的安全生产氛围,对于提高全员的安全生产意识具有重要的促进作用。
2.3建筑工程施工现场的管理
首先就是加强施工人员的技术水平;施工人员在实际工作中应熟知图纸设计内容,从自身的实际情况出发,不断加强工程施工组织规划工作,要让工程在建设过程中的每一个环节都在自己的掌握之中,并且还要提前制定关于发生突发事件的办法。同时,在分配管理人员方面应该根据他们自身具有的优势,采取合理的搭配方式,并明确各个管理人员的岗位职责。其次,对工程的后期管理也要加强重视;工程的后期管理是一项较为复杂、专业性强的工作,其工作的好坏将直接的影响到工程能否在规定期限内保质保量的竣工。对于工程的后期管理,应根据岗位的实际需求,选择出合适的人员,明确其职责,并且还要提高他们的技术、管理、组织等水平,从而实现预期的工程目标。
3.结论
综上所述可知;良好的施工技术与管理水平是确保建筑工程整体质量的保证,因为,其在确保建筑工程整体质量水平的同时,还能够有效的控制住工程建设过程中的造价及进展速度,对我国建筑业的持续发展有着推动性的作用。
参考文献
[1]黄建军.如何搞好现场施工管理[J].山西建筑.2006(7).
[2]史向东.工程现场管理制度的分析[J].黑龙江科技信息,2007(16).
[3]黄振兴.对施工技术管理的探讨[J].科技信息,2009(19):674~610.
[4]李俊杰.建筑工程施工技术管理[J].黑龙江科技信息,2010(4):198.
[5]苏立新.浅谈建筑工程施工技术的问题.四川建材,2008(04).
[6]刘志明.高层建筑项目管理的发展趋势和前景.2007(03).
关键词:建筑工程;施工技术;管理;措施
Abstract: for any construction project is concerned, the construction technology if it has a high level is very important, is to ensure that the quality of the whole project basis. Can say, if construction engineering lost of construction technology of strong support, so, it can only be talking. At present, with the fast development of economy, construction industry for construction technology and its management put forward higher request. This paper focuses on the current architecture engineering construction technology and management of a paper, and also puts forward how to take effective measures of construction technology and its management level will be further improved, and for relevant personage reference.
Keywords: building engineering; Construction technology; Management; measures
中图分类号:TU74 文献标识码:A文章编号:
0引言
最近幾年时间里,大量的建筑工程施工材料与工艺不断涌现,建筑工程无论是在设计、施工质量,还是在施工技术与管理上都有着良好的发展。对于任何一项建筑工程而言,仅仅有一个高水平的设计是不行的,还得有既科学又先进的施工技术以及其管理水平,因为只有施工质量提高了,工程的整体质量才会最优,我国的建筑行业规模才会越做越大。本文主要对当前建筑工程的施工技术以及其管理水平进行了一番论述,并在此基础上提出了有效的措施,以此提高施工技术及其管理水平
1.建筑施工过程中涉及的主要技术
一般来说,建筑工程施工过程中所涉及的主要技术通常有基础施工技术、钢结构技术、混凝土施工技术、建筑防水技术以及装修技术等。最近几年时间里,随着计算机技术与信息技术的快速发展,建筑工程在施工技术管理上也采用了信息化的管理技术。
1.1基础工程施工技术
在基础工程施工技术中,有两个内容最为关键,一个是桩基技术,当前建筑工程中使用最多的是超流态混凝土灌注桩以及人工挖空灌注桩这两种;超流态混凝土灌注桩是由我国技术人员经过不断研究开发出来的一种新的桩型。这种新桩对于施工技术有着很大的好处。。它的制作原理是:先用螺旋钻机进行钻孔,待其深度与规定要求相符时,再通过钻杆芯管利用其特殊的钻头向着孔内从上到下压力灌注超流态混凝土,等到混凝土层面深入到地下水位处,将所有的钻杆提出,在孔内放入钢筋笼来设计其高度,最后一步将混凝土桩补足。这种方法能够实现一次性的成桩目标,并且其在工作中不仅没有震动、噪音,而且也不会给大自然造成污染,同时它还能够在流沙、卵石等及其复杂的地质条件下正常顺利的成桩。超流态混凝土灌注桩的渗透性很强,对于施工过程中发生的断桩、桩间虚土等问题能够有效的进行处理,进一步的将单桩的承载能力提高了。其次,人工挖孔灌注桩技术;指的是在桩位部分通过人工挖掘的办法来完成成孔工作,然后放入钢筋笼,采取灌注混凝土完成基桩的方法。成孔机具有的优点是在实际操作过程中无任何震动与噪音。利用人工挖掘,不仅有利于清理成孔处,而且还能够提高孔的施工质量。为了能够保证人工灌注桩在施工过程中的安全性,应制定完善的防止土体坍塌的支护方法。通常使用的支护方法有:现浇混凝土护壁、钢筋网护壁及钢套管护壁。
1.2混凝土施工技术
混凝土在建筑工程施工中是最不可缺少的一项材料,它在各个建筑工程中起到了关键性的作用。通常,混凝土在使用过程中会因为潮湿、配比不具合理科学性而出现各种问题,所以,我们应重视起混凝土在施工过程中技术的科学性,这是至关重要的。混凝土施工过程中常使用的技术有混凝土预拌、传送技术、钢混劲性结构施工技术、预应力混凝土技术等。
1.3钢结构技术
钢结构是支撑建筑工程整体的关键,它能够确保工程整体具有高质量水平。当前,钢结构在建筑施工过程中的应用发展上,不仅涵盖了原有的钢结构安装、钢材焊接、高强度螺栓施工等技术,而且还包括了预应力钢结构技术,这是其中发展最快的一项技术。并且,最近几年时间里,随着我国大跨度的建筑工程逐步的兴起,建筑业对于预应力钢结构技术越来越重视。
2.建筑工程的管理要点分析
2.1建筑工程质量上的管理
要严格根据建筑工程的要求来规范施工人员的行为,不放过工程建设过程中的每一个环节部分,要严格的把握好监督关,只有这样建筑工程才会具有较高的质量。提高建筑工程质量的管理水平应从三个方面着手解决,第一,要保证建筑工程在施工过程中具有高质量水平;这就要求要建立完善的切实可行的质量保证制度,以此将质量目标全面的贯彻到实际施工中去,并且工程的任何一项程序都必须安排专业人员看守,力争建立高时效、科学的质量管理体系。要时刻提醒施工人员在实际操作过程中必须重视施工技术与质量问题,只有他们保质保量的完成工作,工程的整体质量水平才会得到保证,可以说,施工人员是建筑工程中最为关键的部分。对于施工单位而言,应积极全面的将施工人员潜在的创造力与积极性、能动性充分的挖掘出来,对他们进行良好的管理,提高他们对工作负责的意识,树立起质量第一的安全生产理念。第二,加强管理施工进展速度;对于施工进展速度的管理,首先应从工程自身具有的特征上着手,明确施工人员与施工队伍所要执行的具体工作内容,并制定健全的规章制度、有秩序、有监督管理意识的工程进展速度管理模式,力争竣工后的工程与预期的目标相一致。负责工程进展速度的监督管理人员在管理与配备上必须具有较高的技术能力水平及监督管理水平。对于工程的监督管理者来说,其除了要将自身的业务知识进一步提高之外,还要不断的学习新的相关知识,这样才能满足当前建筑工程的实际需求。另外,加强成本管理力度;要想将工程的成本管理工作做好,应从两个方面着手:首先,严格要求工程成本的管理必须根据事先制定的成本规划、核算、分析等各个环节执行管理工作;其次,工程项目的各个管理人员应根据自己的职责,在工作中时刻以安全生产为基本原则。
2.2建筑工程施工项目安全生产的管理
首先,必须建立完善安全且切实可行的施工制度以及管理机构制度,将安全责任明确,全面的提高员工对于安全重要性的认识。也就是说,在实际建设中融入安全意识,将安全工作抓好,从而使其两者之间形成促进作用。其次,施工企业应根据工程建设具有的特征,制定出既科学合理,又切实可行的安全管理规则。此外,工程的安全生产管理还需要生产部门人员的共同合作,因为这样能够营造出良好的安全生产氛围,对于提高全员的安全生产意识具有重要的促进作用。
2.3建筑工程施工现场的管理
首先就是加强施工人员的技术水平;施工人员在实际工作中应熟知图纸设计内容,从自身的实际情况出发,不断加强工程施工组织规划工作,要让工程在建设过程中的每一个环节都在自己的掌握之中,并且还要提前制定关于发生突发事件的办法。同时,在分配管理人员方面应该根据他们自身具有的优势,采取合理的搭配方式,并明确各个管理人员的岗位职责。其次,对工程的后期管理也要加强重视;工程的后期管理是一项较为复杂、专业性强的工作,其工作的好坏将直接的影响到工程能否在规定期限内保质保量的竣工。对于工程的后期管理,应根据岗位的实际需求,选择出合适的人员,明确其职责,并且还要提高他们的技术、管理、组织等水平,从而实现预期的工程目标。
3.结论
综上所述可知;良好的施工技术与管理水平是确保建筑工程整体质量的保证,因为,其在确保建筑工程整体质量水平的同时,还能够有效的控制住工程建设过程中的造价及进展速度,对我国建筑业的持续发展有着推动性的作用。
参考文献
[1]黄建军.如何搞好现场施工管理[J].山西建筑.2006(7).
[2]史向东.工程现场管理制度的分析[J].黑龙江科技信息,2007(16).
[3]黄振兴.对施工技术管理的探讨[J].科技信息,2009(19):674~610.
[4]李俊杰.建筑工程施工技术管理[J].黑龙江科技信息,2010(4):198.
[5]苏立新.浅谈建筑工程施工技术的问题.四川建材,2008(04).
[6]刘志明.高层建筑项目管理的发展趋势和前景.2007(03).