2012年,中国先进研究堆(CARR)完成全部调试工作,中子散射谱仪首次获得了衍射图像,冷中子源的氦制冷系统设备改造完成,初步安全分析报告上报国家核安全局。各单项验收工作同期开展。1CARR调试在全部条件具备的基础上,2月11日开始C阶段调试试验,相继完成堆功率自动调节特性试验、等温温度反应性系数测量、功率刻度、反应性异常引入等试验后,CARR于2月27日开始提
In 2012, the China Advanced Research Reactor (CARR) completed all the commissioning work. The first time, the neutron scattering spectrometer obtained diffraction images. The cold neutron source helium refrigeration system equipment was completed and the preliminary safety analysis report was submitted to the NNSA. The acceptance of the individual work carried out over the same period. 1CARR Commissioning On the basis of all the conditions, the C-phase commissioning test started on February 11, and the autoprotecting characteristic test of stack power, the measurement of isothermal temperature reactivity coefficient, the power calibration and the introduction of abnormal reaction were completed. On the 27th began to mention