Co-seismic ground deformation and source parameters of Mani M7.9 earthquake inferred from spaceborne

来源 :中国科学D辑(英文版) | 被引量 : 0次 | 上传用户:kjnojn
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
We obtain the co-seismic ground deformation field of the Mani M7.9 earthquake on November 8, 1997 through three-pass differential interferometric processing. Then we get the geometric and kinematics parameters of this event by the elastic half-space model and forward modeling with the InSAR data. The following results have been obtained: (i) The deformation fields on both sides of the seismogenic fault are affected by the co-seismic deformation field even in 110 km away from the fault. The loss of phase coherence belt caused by the zone of ground rupture crosses the image from east to west with a length of an area 110 km. (ii) The maximum horizontal displacement caused by the earthquake reaches 7.96 m. (iii) The earthquake fault can be divided into four parts, and the deformation field of the middle two parts is bigger than that of the other two, with lengths of 27 km and 37 km, respectively. And their average sliding values on the rupture surface are 6500 mm and 6000 mm, respectively, and their depths both are 35 km. The segment of 27 km length is the major rupture surface of this earthquake. The west part and the east part of the fault have lengths of 23 km and 26 km, respectively. The sliding value of the west one is 4000 mm and that of the east one is 5800 mm. They extend to depths of 20 km and 18 km, respectively.
其他文献
人工挖孔桩特有的大承载力优势得到了许多设计、施工单位的认可,确实是一种在软弱地基上经济实用的基础形式,但在施工中还存在着一些问题。本文结合作者工作实践及工程实例,分析
Ultramafic xenoliths are common in Tietonggou intrusion, Laiwu, Shandong Province. Peridotite xenoliths develop two-stage metasomatism popularly: (i) The early
In order to understand the relationship be tween the community structure of bacteria in ice core and the past climate and environment, we initiated the study on
本文针对河西地区农村公路水泥混凝土路面的特点,分析了农村公路水泥混凝土路面常见病害的产生原因,并提出了相应的预防和处治措施。
短线匹配预制箱梁节段、上行式架桥机安装工艺目前在国内却较少采用,属较为新型的一种施工工艺,该工艺要求箱梁拼缝采用高强环氧胶粘结。对箱梁匹配面施胶在现行的路桥施工规范
水利工程的特殊性,一般都要经历冬天施工,而水利工程冬天混凝土施工一直都是水利工程中的难题。本文分析了水利工程混凝土冬季施工存在的问题,并提出了水利工程混凝土冬季施工的
In order to further constrain the tectonic configuration of the Tianshan fold belt and the blocks of its northern and southern sides prior to the Eocene India/E
本文结合阳阳高速公路阳江至阳春段工程,该工程部分水泥混凝土路面采用机制砂代替天然河砂来拌制水泥混凝土进行路面施工,对其进行大量试验以研究机制砂代替天然河砂对水泥混凝
The retrograded eciogites have been discovered in the middle part of the northern margin of the North China Craton, which occur as lens or boudin within biotite
高速公路改扩建在我国是一个新兴的研究方向,包含了众多的研究课题。其中,改扩建期间的施工组织与交通保畅策略是一个重要的内容。目前国内已有一些高速公路改扩建的成功经验,但