包头钢铁公司3号高炉(1800m~3)于1988年7月6日停炉进行大修改造,经过半年紧张施工于1989年1月6日点火送风,1月7日顺利出铁。该高炉设有2个铁口(其夹角为30°)、1个渣口、24个风口。出铁场设有30t 推力的液压泥炮、折叠式液压堵渣机和液压摇动流咀,铁水主沟采用水冷方式。高炉为岛式布置,炉体为钢结构大框架。风、渣、铁口区采用异型大块炭砖砌筑,其中有3个风口试用氮化硅结合的炭化硅砖。炉底为炭砖综合水冷炉底结构。炉顶为并罐无料钟装置,通过受料漏斗下方翻板向左、右料罐装料。料罐有效容积
Baotou Iron and Steel Company No. 3 blast furnace (1800m ~ 3) on July 6, 1988 shutdown furnace overhaul transformation, after six months of intense construction on January 6, 1989 ignition air supply, January 7 smooth tapping. The blast furnace has two iron mouth (the angle of 30 °), a slag mouth, 24 tuyeres. Thruster with 30t thrust hydraulic mud gun, folding hydraulic clogging machine and hydraulic swing Tsui, the main water using hot water way. Blast furnace island layout, the furnace for the steel frame. Wind, slag, iron mouth area using shaped large block of brick masonry, which has three tuyere trial silicon carbide bonded silica brick. Bottom charcoal brick bottom integrated water-cooled structure. Top of the furnace and the tank bell-free device, through the funnel below the flap to the left and right cans charge. Tank effective volume