论文部分内容阅读
山东省枣庄市山亭区业某欲建大棚。其首先建好大棚垛柱2 2个,分东西两排,南北长4 0米,东西宽1 0米。他委托其雇员闫某甲与闫某乙协商,要求闫某乙承揽焊接大棚工作。并把所建大棚的形状、面积等情况告诉闫某乙,闫某乙答应了。双方口头约定:闫某乙承担该大棚的焊接工作,原材料由闫某甲负责;焊接工具和焊条由闫某乙负责,闫某甲付给闫某乙加工费1 5 0元。
Shanting Zaozhuang City, Shandong Province industry to build a shed. First of all, it builds a large pile of piles 22, divided into two rows of things, 40 meters long from north to south, 10 meters wide east-west. He entrusted his employees Yan a negotiate with Yan a, asked Yan Mou B contract welding shed work. And to build the shape of the shed, area, etc. told Yan a B, Yan A promised. The two sides verbally agreed: Yan B undertook the welding work of the shed, raw materials by a Yan A responsible; welding tools and welding rod by the Yan B is responsible for Yanmou A to pay Yan A B processing fee of 150 yuan.