(一)有关问题的提出能源水规[1989]971号文颁布的《水利水电工程设计概(估)算费用构成及计算标准》(下称“971号文”)在设备费一章中关于设备原价的第三条规定:大型机组分块运至工地的拼装费用,应包括在设备价格内。即分块部件拼装费用(笔者暂将这种现场拼装工作称为分块部件拼装,费用称为分块部件拼装费用,以区别于已经包含在现行概预算定额之内的工作)不包括在现行概预算定额中,费用性质为设备费,并且包含在设备的原价中。分块部件拼装实际上是由施工企业完成的,因而在执行过程中遇到一些问题。随着水电机组容量的不断增大,机电设备特别是机组设备
(I) Issues Concerning the Proposal The composition and calculation standard of water conservancy and hydropower project design estimate (hereinafter referred to as “No. 971”) promulgated by Energy Water Regulation [1989] No. 971 In the third paragraph on the original price of equipment: bulk unit shipped to the site of the assembly costs, should be included in the price of the equipment. That is, the cost of sub-block assembly (the author tentatively put the assembly work on site as block assembly, the cost is called block assembly costs, as distinguished from the already included in the current budget within the fixed budget) is not included in the current In the estimated budget, the nature of the fee is equipment fee and is included in the original price of the equipment. The assembly of block parts is actually completed by the construction enterprises, and thus encountered some problems in the implementation process. With the increasing capacity of hydropower units, electromechanical equipment, especially unit equipment