论文部分内容阅读
随着时代的发展,隧道施工技术的进步,我国已经逐步建成了覆盖全国的铁路主干线网络,隧道工程作为铁路建设中的不确定性问题,如何更好的完善相关施工技术一直困扰着我们建设者。中国地广物博,地质结构复杂多变,这就加大了隧道建设的难度,加大对炭质板岩大断面隧道围岩稳定性的分析,引进先进施工工艺和科技设备,结合当前施工中出现的各种问题,完善施工技术工艺,改善施工条件,消除安全隐患,确保隧道工程在工期要求节点内保质保量完成,实现经济效益和社会效益的最大化,推动隧道施工持续健康发展,以便更好地为人们提供出行服务,推动社会良性运转。
With the development of the times and the progress of tunnel construction technology, China has gradually built up a network of railway trunk lines that cover the whole country. As a matter of uncertainty in railway construction, how to better perfect related construction techniques has always plagued our construction By. China Broad Earthquake, complex and changeable geological structure, which increases the difficulty of tunnel construction, increase the stability of large-scale carbon rock surrounding rock mass of tunnel analysis, the introduction of advanced construction technology and technology equipment, combined with the current construction To improve the construction conditions and eliminate potential safety problems, to ensure that the quality and quantity of tunnel projects within the requirements of construction period are completed, to maximize the economic and social benefits, to promote the sustainable and healthy development of the tunnel construction, In order to better provide people with travel services and promote healthy social functioning.