论文部分内容阅读
本文采用多目标非线性规划方法对小湾拱坝最优封拱温度场进行了初步的研究 ,给出了小湾拱坝最优的封拱温度场。
In this paper, the multi-objective nonlinear programming method is used to study the optimal arch temperature field of Xiaowan arch dam, and the optimal arch temperature field of Xiaowan arch dam is given.