施工前的质量管理往往被人忽视,工程项目多,顾尾顾不了头,匆促上阵,给开工后带来的后遗证很多,难手应付。不抓住施工前的质量管理,就失去了均衡施工的节奏。在国外有句口头语:“良好的开端、成功的一半”说得就是这个道理。我参加过国家经委组织的国家质量管理奖评审小组工作,去上海宝钢冶金部第五冶金建设公司第三工程公司检查质量工作,从他们承担的具有世界先进技术水平的大型焦化联合企
The quality management before construction is often neglected, and there are many projects. Gu Gu can’t care for the head and hurry to go into battle. After the start of construction, many post-mortem certificates are brought to bear. Without grasping the quality management before construction, the pace of balanced construction will be lost. There is a saying abroad: “A good beginning, half of success” is the reason. I participated in the national quality management award evaluation team organized by the State Economic Commission and went to Shanghai Baosteel Metallurgical 5th Metallurgical Construction Company No. 3 Engineering Company to inspect the quality work from the large-scale coking joint ventures they have undertaken with the world’s advanced technology level.