DZ-12/4 Multi-energy Electron Linear Accelerator Acceptance Test

来源 :Annual Report of China Institute of Atomic Energy | 被引量 : 0次 | 上传用户:wqiufeng1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
DZ-12/4multi-energy electron linear accelerator device established by China Institute of Atomic Energy can provide 6 MeV,8 MeV,10MeV,12MeV electron energy beam,mainly used to establish electron beam reference radiation fields of radiation processing dose level,and DZ-12 / 4multi-energy electron linear accelerator device established by China Institute of Atomic Energy can provide 6 MeV, 8 MeV, 10MeV, 12MeV electron energy beam, mainly used to establish electron beam reference radiation fields of radiation processing dose level, and
其他文献
Shear system is the essential equipment of head-end processing in the spent fuel reprocessing process,with the aim of cutting spent fuels into appropriate lengt
钠钾合金制备回路于2003年建成,回路主要包括储钠罐、储钾罐、输钠罐、输钾罐、钠钾合金制备罐、过滤器及相应的阀门和管道,主要为CEFR一回路冷阱夹套制备钠钾合金。该回路运
从2011年开始,我陆续走访了多位囤积症患者的居所,拍下他们所处空间的模样。我希望能以此方式走进他们的生活,理解他们心中对于“占有”本身的迫切需求,试图从一片狼藉中挖掘
301of the Department of Radiochemistry,is in charge of the management of radioactive waste and the safety of the relative facilities to meet the request of the
本文主要讨论了我国在足球后备人才培养过程中存在的问题,同时提出了相应对策,希望给我过足球的长足发展提供建议。 This article mainly discusses the problems that exis
China Experimental Fast Reactor(CEFR)is apool-type structure and sodium-sodium-water loops heat transmission system reactor,which thermal power of 65MW and elec
根据放射化学研究所工作会议精神和工作部署,2015年核燃料后处理放化实验设施(CRARL)重点任务是:上半年,凝心聚力、攻坚克难、奋战100天为热试验创造条件;下半年,统一思想、
自2014年以来,校园足球几乎家喻户晓。升级版新校园足球如火如荼地开展着,尤其是足球试点校每周一节足球课,更加重视了足球教育的普及。足球运动的特殊性,单纯靠过去传统的教
燃料操作监控系统是示范快堆核岛主要仪控系统之一,其功能是监控换料及工艺运输机械设备运动,完成从新燃料库房至乏组件水池的各类组件转运,设计流程如图1所示。2015年完成了
China Reprocessing and Radiochemistry Laboratory(CARAL)is a important hot test platform for irradiated fuel reprocessing of our country.High-level liquid waste(