合肥110kV市府变电站是合肥地区第一座以无人值班站标准设计并投运的变电站。该站有2台主变压器,容量为40MVA,电压110kV/10kV,其中110kV高压侧采用GIS组合电器,10kV侧采用手车式断路器,主变具备有载调压功能。取消传统仪表、控制、中央信号屏。测量、远动和当地监控系统统一使
Hefei 110kV municipal substation is the first substation in Hefei to unmanned station standard design and put into operation. The station has 2 main transformers, with a capacity of 40MVA and a voltage of 110kV / 10kV. Among them, 110kV high voltage side adopts GIS combination electrical appliances and 10kV side adopts handcart type circuit breakers. The main transformer has on-load voltage regulation function. Cancel the traditional instrument, control, the central signal screen. Measurement, teleconnection and local monitoring system unified make