陈大工程建设质量管理浅谈

来源 :河南水利 | 被引量 : 0次 | 上传用户:yyy_chj
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 陈大工程质量管理体系的建立1.1 质量目标的确定陈大工程建设的质量管理总目标是优良工程。质量管理目标的确定,是工程建设质量管理的方向。为达到上述目标,工程建设伊始,陈大工程建设管理局便按“高标准、严要求”的方针,通过招标选择优秀的监理单位、施工单位和供贷商,为工程建设质量实现优良目标打下了牢固的基础。 1 Chen big project quality management system establishment 1.1 quality target determination Chen big project construction quality management general goal is the fine project. The determination of the goal of quality management is the direction of the quality management of engineering construction. In order to achieve the above goal, at the beginning of project construction, Chen Da Engineering Construction Bureau will select excellent supervision units, construction units and loan providers through bidding according to the principle of “high standard and strict requirement”, so as to achieve excellent project construction quality The goal has laid a solid foundation.
其他文献
三峡工程在宜昌,抢抓蓄水发电的重大机遇,是实践“三个代表”重要思想的具体体现,是实现宜昌经济社会可持续发展的必然要求。目前,距三峡工程蓄水发电已时日不多,因此我们应
“水利是农业的命脉。”这句话是毛泽东同志对水与农业、农村、农民乃至整个国计民生关系的形象概括和准确定位。新中国成立以来,为了抗旱排涝和提高人民生活水平,国家陆续
小浪底南岸引水口工程1997年8月开工建设以来,建管局始终坚持贯彻执行国家“百年大计,质量第一”和“安全生产,预防为主”的方针,扎扎实实搞好质量、安全生产工作,确保了工
I had assured the group as we flew out fromHeathrow that the approach into Beijing wouldprovide spectacular views of the Great Wall. In-stead we descended thro
1 工程概况淮河入海水道工程为一等工程,滨海枢纽立交地涵为1级建筑物。地涵设计泄洪流量2270m~3/s,新建23孔地涵,采用上槽下洞结构形式(洞身分为三节,其中上、下洞首各长25
1 广阔渠概况1975年,在“农业学大寨”高潮中,为改变郏县西北部和北部岗丘缺水地区的生产条件,大力发展农业生产,县委、县政府动员全县群众修建引汝广阔渠。1975年冬季动工
在我的印象中,一个国家的金库,就像一个家庭的珠宝盒,那是相当珍贵而又极其秘密的,然而在美国,居然允许人们参观,而且每年有大约两万名观众,这使我很感兴趣。于是,女儿便与
郏亶 北宋水利学家,著有《吴门水利书》等,王安石极赏识他。 王世贞 明代文坛后七子领袖。相传《金瓶梅》乃出自其手,他筑的弇山园在明代被誉为“东南第一名园”。 仇十洲
1999年国庆期间”引爆”的旅游潮占据了各地报章头条,这极富中国特色的全民大出行,令旅游业界人士大跌眼镜。不幸的是热闹之后,兴奋的旅游者转身即成比窦娥还冤的消费者──曝光很容
在贵州省水电开发面临实施西部大开发和“西电东送”战略新机遇的形势下,中国水电顾问有限公司会同贵州省计委于2002年10月22日至29日期间,主持召开审查会议,先后对《清水河