兰新铁路第二双线百里风区、三十里风区核心区的浅路堑及路堤地段设置防风明洞,其结构形式采用分片预制构件。结合防风明洞荷载和结构特点,介绍预制构件接缝的刚性连接、螺栓连接和钢结构连接后浇筑混凝土的刚性连接,并从使用性能和安全、结构受力和投资、施工方面分析连接方式的优缺点,推荐采用浇筑混凝土的刚性连接方式,根据施工需要也可采用预制构件中预埋钢板与型钢临时连接方式。
Lanzhou-Xinzhou Railway, the second two-lane Baili-Fengzang area, and the light-cut and embankment sections in the core zone of the Sishili wind area are set up with the windbreak of Myeong-dong, and their structural forms are made of prefabricated pieces. Combined with the load and structural characteristics of the wind tunnel, the rigid connections of the joints of the prefabricated components, the rigid connections of the bolted joints and the poured concrete after the connection of the steel structures are introduced, and the connection modes are analyzed from the aspects of serviceability and safety, structural stress, investment and construction Advantages and disadvantages, we recommend the use of rigid concrete pouring connection, according to the construction needs can also be prefabricated components embedded steel and steel temporary connection.