上犹江水电站的主厂房设在空腹重力坝的溢流坝段内,与地下式或封闭河床式电站相似。装有4台1.5万kw竖轴水轮发电机组。这种坝内式厂房存在通风条件差、潮湿和噪声大三大弊病,尤以噪声大使运行人员深受其害,现将噪声的来源、降低噪声的措施和效果介绍如下。(一) 噪声来源及其特点经测定,厂房内噪声主要来源有以下方面: The main plant of Shangyoujiang Hydropower Station is located in the overflow dam section of the fasting gravity dam, similar to the underground type or closed river bed type power station. Equipped with 4 sets of 15000 kw vertical axis turbine generator set. This dam-type plant has poor ventilation, humidity and noise of the three major shortcomings, especially the noise ambassador operating personnel suffer, now the source of noise, noise reduction measures and effects are described below. (A) the source of noise and its characteristics After the determination, the main sources of noise within the plant has the following aspects:
其他文献
努力把供销社办成农民的合作经济组织颜金尧1995年2月中共中央、国务院《关于深化供销合作社改革的决定》和9月省委、省政府《关于贯彻(中共中央、国务院关于深化供销合作社改革的决
老字号再放异彩──大连妇女儿童用品商店的透视李贵,傅洪群大连天百集团近几年,大连市新商厦不断兴建,装潢豪华,磅礴辉煌,档次设施居国内一流。相比之下,国有老字号商家硬件设施逐
白山电站1号机组于1984年12月11日顺利完成了72小时连续带负荷试验。至此,哈尔滨电机厂为白山电站1期工程制造的3台300MW水轮发电机组已全部并网发电。1号机组经8次正式起机
现有文献仅仅从价值相关性和可靠性两个方面分析了公允价值计量的经济后果,而较少涉及到其他方面的经济后果。本文利用中国上市公司2007-2010年的数据,实证检验了公允价值计
在水利水电工程的施工开挖中,采用深孔爆破技术的前景非常广阔.因此,掌握这方面的知识,不断地加深对该技术的理解,借鉴国外有关的先进技术和经验,对于加速和高质量地开挖水
一、概况镜泊湖新厂,首部为地下式厂房。进水口系采用水下岩塞爆破施工方法,於1975年9月完成的,1977年第一台机组发电。为了防止污物进入发电洞内,影响机组安全运行,先采取
日本东京电力公司自1979年10月开始在枥木県今市的北部山区兴建一座装机为105万千瓦的大型抽水蓄能电站,厂房设在地下,其洞室宽33.5米、高51米、长160米,埋深400米,是目前世
一、形成洪水灾害的原因是多种多样的有暴雨形成的洪水(雨洪);有融雪造成的洪水(春汛);还有降雨兼融雪造成的洪水(俗称桃花汛),这种情况的次雨量的径流系数较大。我国北方,
建国以来,随着水利水电建设事业的发展,我国水利水电测量工作取得了很大成绩。据不完全统计,共完成一、二等精密水准测量9万多公里,三、四等水准测量29万公里;完成的各种比
近些年来,有机薄膜场效应晶体管(OTFTs)得到了快速的发展,但是载流子在薄膜中的传输机理以及如何有效地通过控制有机半导体层的形貌来构筑高性能的有机薄膜晶体管器件仍然是