做好建设项目前期工作的思考

来源 :理论界 | 被引量 : 0次 | 上传用户:mengminyan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
目前投资领域结构调整的关键和难点是如何在激烈的国内外市场竞争环境下选准、选好建设项目。因此,必须加强和改进建设项目的前期工作,切实提高前期工作的质量。一、加强地区布局和行业规划对建设项目前期工作的指导经过十几年的经济建设和发展,我国大部分产品的生产能力已 At present, the key and difficult part of structural adjustment in the field of investment is how to choose the right construction projects under the fierce competition in domestic and international markets. Therefore, it is necessary to strengthen and improve the preparatory work for construction projects and earnestly improve the quality of the preparatory work. First, to enhance regional distribution and industry planning guidance for the preparatory work for construction projects After more than 10 years of economic construction and development, most of our product production capacity has been
其他文献
  The load and resistance factors are generally obtained using the First Order Reliability Method (FORM), in which the design point should be determined and d
会议
南京长江第四大桥主桥为166m+410m+1418m+363m+118m双塔三跨全飘浮钢箱梁悬索桥结构,其中北锚碇基础采用沉井结构形式.沉井顶面高程+4.300m,基底高程-48.500m,置于密实卵砾石
椒江二桥主墩桩基采用φ2.8~2.5m嵌岩桩,设计最低桩底高程-140.17m,钻孔平台高程+7.5m,总孔深达147.67m,施工控制难度大.本文介绍了椒江二桥超深大口径钻孔灌注桩在复杂地质条
会议
阐述了辽河特大桥在严寒施工条件下,如何对主桥索塔施工的海工混凝土进行设计.结合钻石型索塔特点和工况条件,合理选择、布置了相应的设备设施,并采取了相应的施工技术,尤其
我的家乡在烟台,这是一座美丽的海滨城市.rn烟台出产水果,最有名的就是苹果.苹果不仅颜色鲜,味道甜,而且营养丰富,有“水果之王”之称.
期刊
魁岐大桥包括主桥和南北引桥及北侧互通立交,主桥为斜拉桥,全长510m,桥跨组成为(120+270+120)m,主塔结构设计采用牌坊风格的"H"形钢筋混凝土结构.11号主墩桩基直径2.8m,长度
当前小学课堂精彩纷呈,各种形式的教学手段大放异彩.其中,在课堂上引入游戏模块来带动整个学习气氛,吸引学生的注意力,从而达到教学目的的方式被许多老师所关注.那么,游戏和
期刊
得到崔树强的专著《气的思想与中国书法》已经多时,却迟迟不能动笔。这不仅仅是因为它沉甸甸的厚重,更是因为全书视野的开阔和思考的深度使我不得不花上些时间细细阅读。这是
【摘要】要和文化背景不相同的人进行交流,就必须具备一定的跨文化交际能力。目前,学生英语综合应用能力的培养是大学英语的主要目标,而听和说是最主要的部分,它们是保证学生未来有效使用英语进行交流的基础条件,并有利于英语综合素养的提高,从而满足国际交流发展的需求。因此,本文对大学英语教学中学生跨文化交际能力的培养策略进行分析。  【关键词】跨文化交际能力 培养 大学英语 教学  【中图分类号】G64【文献
上海长江大桥主桥为混凝土塔柱钢箱梁双索面五跨连续斜拉桥,本文以上海长江大桥斜拉索施工为背景,着重介绍超长、大直径斜拉索塔端牵引、张拉施工技术,以及斜拉索施工过程中的