论文部分内容阅读
1.化工部自控中心站从3月~5月分别在西安、天津、乐清对“接地”、“自动分析器室”、“仪修”、“图形符号”、“老体制设计深度”、“信号联锁”、“配管配线”、“控制室”、“供电”等九项设计规定送审稿进行了会议审核。 2.中国石化总公司工程部于4月初召开所属设计院的自控专业负责人座谈会,就贯彻工厂模式改革,对仪修、控制室、DCS的设计提出了原则意见。 3.化工部基建司于4月初召集有关中心站站长、对“化工设计体制改革(新体制)”进
1. From the Ministry of Chemical Industry’s automatic control center station from March to May in Xi’an, Tianjin, Yueqing, “grounding”, “automatic analyzer room”, “cultivation”, “graphical symbol”, “old system design depth”, “ Nine design rules such as signal interlock, piping wiring, control room, and power supply were submitted for review at the meeting. 2. The Engineering Department of Sinopec Corp. held a seminar for the self-control professional responsible person of its design institute at the beginning of April to put forward principles and opinions on the reform of the factory model and the design of the instrument repair, control room, and DCS. 3. The Infrastructure Department of the Ministry of Chemical Industry convened the head of the relevant central station in early April to advance the reform of the ”chemical design system (new system)."