Treatment of the wastewater from the sintering flue gas desulfurization process

来源 :Baosteel Technical Research | 被引量 : 0次 | 上传用户:Pleasehelp
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The limestone-gypsum flue gas desulfurization(FGD)process has become the most widespread process in the world for sulfur removal.The swirl-et-absorbing wet limestone-gypsum sintering FGD technology was developed for sintering flue gas desulfurization,and this process produces volumes of wastewater with various contaminants that requires treatment before disposal or reuse.In this study,the wastewater quality from three different sintering FGD systems at Baosteel Group was investigated and compared with wastewater from power plant FGD.A treatment process was proposed which is suitable for sintering FGD wastewater.After treatment with a neutralization,coagulation and sedimentation process,heavy metals in the sintering FGD wastewater were reduced to a level meeting the relevant emission standards,but the pH and ammonia concentration were too high,and a further treatment process was needed.Due to certain similarities and complementarities between sintering FGD wastewater and coking wastewater,it is entirely feasible to mix the pretreated sintering FGD wastewater into a biological coking wastewater treatment system.This study indicates that it is entirely feasible to mix pretreated sintering FGD wastewater into the biological treatment systems used for coking wastewater from the iron and steel industries. The limestone-gypsum flue gas desulfurization (FGD) process has become the most widespread process in the world for sulfur removal. The swirl-et-absorbing wet limestone-gypsum sintering FGD technology was developed for sintering flue gas desulfurization, and this process has been volume of wastewater with various contaminants that require treatment before disposal or reuse. this study, the wastewater quality from three different sintering FGD systems at Baosteel Group was investigated and compared with wastewater from power plant FGD. A treatment process was proposed which is suitable for sintering FGD wastewater. After treatment with a neutralization, coagulation and sedimentation process, heavy metals in the sintering FGD wastewater were to a level meeting the relevant emission standards, but the pH and ammonia concentration were too high, and a further treatment process was needed. Due to certain similarities and complementarities between sintering FGD wastewater and coking wastewat er, it is entirely feasible to mix the pretreated sintering FGD wastewater into a biological coking wastewater treatment system. This study shows that it is entirely feasible to mix pretreated sintering FGD wastewater into the biological treatment systems used for coking wastewater from the iron and steel industries .
其他文献
为提高证据冲突情况下目标识别的准确性,提出了基于证据综合可信度改进证据融合次序的目标识别算法.新算法基于证据之间的差异性大小来确定度量冲突所用参数并给出了证据综合
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
为更好地将过载指令协调分配给各执行机构,实现复合控制导弹的有效跟踪,提出一种过载指令动态分配策略.首先,建立轨控式直/气复合控制导弹俯仰通道数学模型,并对执行机构进行
A conoscopic holography-based 3D measurement system for analyzing the defects on the surface of steel plates was introduced in this paper.The hardware,which is automated through software,performs samp
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
考虑移动多智能体的动力学行为,在保证其不发生碰撞的前提下,研究了一类具有活动边界的分布参数系统的移动控制问题.假设每个智能体上安装了并列的传感器和执行器,传感器对系
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥