论文部分内容阅读
本文简要介绍了在寒冷地区采用土工格栅加筋碎石垫层进行过湿路段处理的方法,以及这种方法解决土基发生工后不均匀沉降和冻胀问题所达到的效果,阐明了这种方法在寒区进行推广应用的价值。
This article briefly introduces the method of treating wet road sections with geogrid-reinforced gravel cushion in cold areas and the effect of this method to solve the problem of uneven subsidence and frost heaving after foundation construction, Ways to promote the value of the cold area.