青印溪二级水电站是1座高水头、长压力引水隧洞水电站。采用“水电站用爆破膜代替调压井”新技术,解决调节保证问题。现场试验和运行实践证明,爆破膜作为水电站调节保证措施,可以应用于高水头、长压力引水隧洞水电站。
Qingyin Creek Hydropower Station is a high head, long pressure diversion tunnel hydropower station. The use of “hydropower substituting surge tank surge tank” new technology to solve the problem of regulation and guarantee. Field tests and operational practices have proved that blasting membranes, as a guarantee for hydropower station regulation, can be applied to high-head and long-pressure diversion tunnel hydropower stations.