1989年9月10日,兰科所驻福州办事处与香港得利滔企业有限公司在福州市就转让JR—1固体燃料及炉具技术专利和提供生产该产品的机械设备等有关事宜达成协议。该协议规定:兰科所以人民币65万元将中国专利四项固体燃料及炉具的制造、经营权,并把四组100HP油压机组成的日本固体燃料1吨的成套机械设备转让给得利滔独家生产、经营(双方认可其中机械设备转让费人民币15万元,固体燃料和炉具专利转让费人民币50万元);兰科所负责提供专利书及其全套技术资料,并负责指导机械设备安装、调试和全流程生产工艺的技术人才培训,确保在45天内生产出合格的产品;兰科所负责长期包干该产品生产的技术指导,得利滔提取该产品税后盈利的15%给兰科所作为专利开发补偿费用。协议签订后,得利滔于1989年11月2日将人民币65万元支付给兰科所驻福州办事处。 1989年10月10日、1990年1月10日,兰科所分两次将四台机器运至福州交付得利滔在福建开办的独资企业“福建长利新能源有限公司”(下称长利公司)使用,兰科所同时派人对机器进行了安装调试并
On September 10, 1989, Lanzhou Office in Fuzhou and Hong Kong Delisheng Enterprise Co., Ltd. reached an agreement in Fuzhou on matters relating to the transfer of JR-1 solid fuel and oven technology patents and the provision of mechanical equipment for the production of the product. . The agreement stipulates that Lanke’s RMB 650,000 yuan will be the right to the manufacture and operation of four solid fuels and stoves for Chinese patents, and the transfer of four sets of 100-ton hydraulic presses to a one-ton complete set of Japanese solid fuels will be transferred to Deli’s exclusive Production and operation (both parties recognize that the transfer fee for machinery and equipment is RMB 150,000, and the transfer fee for solid fuel and stoves is RMB 500,000); Lanke is responsible for providing the patent book and its full set of technical data, and is responsible for guiding the installation of machinery and equipment. Technical personnel training for commissioning and full-process production processes ensure that qualified products are produced within 45 days; Lanke is responsible for long-term technical guidance for the production of this product; Delixi extracts 15% of the after-tax profit of the product to Lanke. As a patent development compensation fee. After the agreement was signed, Deloitte paid RMB 650,000 yuan to the branch office of Fuzhou Branch in Fuzhou on November 2, 1989. On October 10, 1989 and January 10, 1990, Lanke delivered the four machines to Fuzhou in two separate shipments to Fujian Deli New Energy Co., Ltd. (Lie Company) used, and Lanke sent people to install and debug the machine at the same time.