论文部分内容阅读
分析了剥山填海地基上建筑物产生严重不均匀沉降的原因,介绍了采用注浆法对其进行处理的设计与施工。
The reasons for the serious uneven settlement of the building on the stripping and reclamation ground were analyzed, and the design and construction of the treatment using the grouting method were introduced.