论文部分内容阅读
天津某房地产发展有限公司投资建设的住宅小区安装18台电梯,额定速度1.5m/s,额定载重量1000kg,15层15站,有机房曳引驱动式电梯。选配XSQ115-09型双向限速器、RB106A-J型上行超速保护装置、渐进式安全钳、液压缓冲器等部件。1检验试验过程2008年9月,受用户委托,对电梯进行安装监督检验。依据《电梯监督检验规程》对电梯进行限速器——安全钳联动试验及上行超速保护装置试验。
Tianjin Real Estate Development Co., Ltd. invested a residential area to install 18 elevators, rated speed of 1.5m / s, rated capacity of 1000kg, 15 floors 15 stations, traction drive room with traction. Optional XSQ115-09-type two-way speed limiter, RB106A-J-type speeding protection devices, progressive safety gear, hydraulic buffers and other components. 1 test test process September 2008, commissioned by the user, the elevator installation supervision and inspection. According to the “elevator supervision and inspection procedures” on the elevator speed limiter - safety gear linkage test and the uplink speeding device test.