该蓄水池为宁夏柳条沟截潜工程的配套工程。长方形水池,下底尺寸130米×160米,上顶尺寸216米×185米,高10米,蓄水深9米,蓄水量25万立米。蓄水池进出水口坡降为1/100。堤身用混合砂石料填筑,堤顶宽3—9米,外坡1:15,临水坡为1:2、1:2.5、1:3、1:3.5四种。内坡面根据地形和基土情况设计成台阶形,台口侧为1.0米,垂直进出口的西侧为1.4米,东侧为0.8米。
The reservoir for Ningxia wicker ditch submarine projects supporting projects. Rectangular pool, bottom size of 130 meters × 160 meters, the top size of 216 meters × 185 meters, 10 meters high, water depth of 9 meters, water storage 250,000 stere. Reservoir inlet and outlet slopes to 1/100. Embankment filled with mixed sand and gravel embankment roof width of 3-9 meters, the outer slope 1:15, Pro Shui Po 1: 2,1: 2.5,1: 3,1: 3.5 four. The inner slope is designed as a step shape according to the topography and the soil conditions. The side of the platform is 1.0m, the west of the vertical inlet and outlet is 1.4m, and the east is 0.8m.